Lift Renovation Schedule


STARTS 9 SEPTEMBER 2024

Hamiltons has confirmed the start date for the installation of our new lift. The installation work will commence on-site on 9th September 2024 and is expected to be completed by 8th November 2024.

Please complete the survey below to help us manage the outage.

Important Considerations

To ensure your apartment remains safe and to avoid any potential issues if you are to be absent from the Pines, please consider the following suggestions:

1. Turn Off Hot Water Heaters:
   – To save energy and prevent any potential issues, please turn off your hot water heaters before leaving.

2. Turn Off Water Supply:
   – Shutting off the water supply can help prevent any leaks or water damage while you are away.

3. Leave a Key with a Trusted Person:
   – In case of emergencies, such as a fire alarm sensor failure, leave a key with a trusted neighbor or friend who can access your apartment if needed. This may prevent the Fire Brigade from having to break down your door if the fire sensor failure is traced to your floor level.

We appreciate your cooperation and understanding during this period. Should you have any questions or concerns, please do not hesitate to contact our Building Liaison Tim Muir.

Thank you for your attention to this matter.

Tim Muir
Building Liaison SP3840